Electronic Consignment Note UNSM (e-CMR)
other Linktoparent
Submitted date | Last Update Date | Version |
---|
Project Proposal Status | Project Page | |||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
|
|
|
Electronic Consignment Note UNSM (e-CMR) |
Project Purpose
Text Area | ||||
---|---|---|---|---|
| ||||
The project’s purpose of the project is to definedevelop and thepublish proceduresan forinternational theXML creation“Electronic andConsignment publicationNote” ofmessage CCL(e-basedCMR) Referencefor Data Modelsinternational and associated artefacts. The targeted versionnational transportation of thegoods Core Component Library (CCL) is D16A.by road. |
Project Scope
Text Area | ||||
---|---|---|---|---|
| ||||
TheAdditional protocol completeto processthe fromconvention inceptionon tothe publicationcontract for Reference Data Model development and publication including but not limited to: • Relationship with CCL • Relationship with CCBDA RSM artefacts (as defined by Procedure for CCTS 2.01 & CCBDA 1.0 & NDR 2.1 Artefacts Publication Project) • Validation rules • Definition of the publication bundle The project will define how to implement ODP for Reference Data Model artefacts. It will take into account the requirements linked to CCTS 2.01 & CCBDA 1.0 & NDR 2.1 artefacts publication. As a proof of concept a draft of either the current SCRDM Data Reference Model or the current MMT Data Reference Model under development or both will be prepared for publication the international carriage of goods by road (CMR) concerning the electronic consignment note has been entered into force on 5 June 2011. Protocol has been ratified by numerous countries of European Union thus allowing performing road carriage of goods by road on their territories with the use of electronic consignment note. Furthermore, the development of appropriate technical solutions has already started by different private companies. The project scope is to standardize and harmonise the electronic consignment note message to be exchanged between carrier, shipper and receiver of the goods. Such electronic message shall be considered as an electronic contract of carriage of goods by road in accordance with the provisions of the above-mentioned protocol. Furthermore, the implementation of standardised electronic consignment note message may facilitate further interactions with other modes of transport. |
Project Deliverables
Text Area | ||||
---|---|---|---|---|
| ||||
The deliverables from this project willdeliverables includeare: • ProceduresSubset definition,BRS Descriptionfor ofElectronic theConsignment deliverablesNote atbased eachon stepMMT • Proof of concept (MMT and/or SCRDM draft Reference Data Model) • First publication (machine processable and presentation artefactsCCBDA RSM for Electronic Consignment Note based on MMT • An XML schema of the Electronic Consignment Note Message • Mapping to the relevant existing EDIFACT UNSM (IFTMIN) |
Exit Criteria
Text Area | ||||
---|---|---|---|---|
| ||||
• Procedure document published • Proof of concept successful completed • Public Review, comments resolution completed.• Subset BRS for Electronic Consignment Note based on MMT o External review disposition log o Final draft ready for publication • CCBDA RSM for Electronic Consignment Note based on MMT o External review disposition log o Final draft ready for publication • An XML schema of the Electronic Consignment Note Message o Incorporation into the Core Component Library, if required o Final deliverable ready for publication by Library Maintenance • Mapping to the relevant existing EDIFACT UNSM (IFTMIN) o External review disposition log o Guidance document ready for publication |
Project Team Membership and Required Functional Expertise
Text Area | ||||
---|---|---|---|---|
| ||||
MembershipThe project team is open to UN/CEFACT Experts experts with broad knowledge and experience in the area of standardssupply productionchain and publication and awareness of implementer’s expectations, the functions of UN/CEFACT, and its groups. related activities as well as in modelling techniques. In addition, Heads of Delegations may invite technical experts from their constituency to participate in the work. Experts are expected to contribute to the work based solely on their expertise and to comply with the UN/CEFACT Code of Conduct and Ethics. |
Head of Delegation Support
Text Area | ||||
---|---|---|---|---|
| ||||
• Germany • FranceNetherlands • Austria Ukraine |
Geographical Focus
Text Area | ||||
---|---|---|---|---|
| ||||
The geographical focus is global. |
Initial Contributions
Text Area | ||||
---|---|---|---|---|
| ||||
Initial contributions will be sourced from existing documentation and standards including: • Convention On The Contract For The contributions submitted with this proposal include: • MMT and SCRDM draft deliverables • Procedure for CCTS 2.01 & CCBDA 1.0 & NDR 2.1 Artefacts Publication Project International Carriage Of Goods By Road (CMR), chapter III, Article 6 o (https://treaties.un.org/Pages/ViewDetails.aspx?src=TREATY&mtdsg_no=XI-B-11&chapter=11&lang=en) • T&L's Multi-Modal Transport Reference Data Model (project p1023) • There are no known IPR issues and there are no planned formal collaborations. |
Resource Requirements
Text Area | ||||
---|---|---|---|---|
| ||||
Required resources include project management and modelling expertise. |
Project Leadership
Text Area | ||||
---|---|---|---|---|
| ||||
Proposed Project Leader: Evgeniya Iafaev [PersonProposed from M&T specification domain Proposed] Lead Editor: Rudy Hemeleers Other Editors: [PersonBérengère from M&T specification domain Proposed] Coupet Maisonnave |
Milestones
DELIVERABLE NAME | Project Inception | Expected Completion Date | Requirements Gathering | Expected Completion Date | Draft Development | Expected Completion Date | Public Review | Expected Completion Date | Project Exit | Expected Completion Date | Publication | Expected Completion Date | Maintenance | Expected Completion Date |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Text Field | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Text Field | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
|
Project Proposal Files
Attachments | ||
---|---|---|
|