Canonical Model
other Linktoparent
Project Details
Page properties | ||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
|
|
|
|
|
|
|
|
|
SP Page Status | ||||
---|---|---|---|---|
|
Comment |
---|
Insert here a link to the project page using the brackets [ ] |
Project Purpose
Text Area | ||||
---|---|---|---|---|
| ||||
The project’s purpose is to address the now globally recognised importance of the role of canonical process and data models in facilitating trade.
Given UN/CEFACT’s current global recognition as a proven and effective standards developer, the development of such a canonical mode is considered to be UN/CEFACT’s number one opportunity.
The project will draw on UN/CEFACT’s sound foundations and current progress to date in the development of such a canonical model and proceed to develop guidelines to assist all working groups engaged in the development of UN/CEFACT standards and recommendations to contribute effectively to the delivery of the required canonical model.
What does “canonical” mean?
(adj.) Authoritative or standard: conforming to an accepted rule or procedure. When referring to programming, canonical means conforming to well-established patterns or rules. The term is typically used to describe whether or not a programming interface follows the already established standard.
The opportunity & the driving forces
UN/CEFACT is poised to significantly contribute to:
• Blockchain enabled “Trust” applied to the supply chain
• Internet enabled “Collaboration” applied to the supply chain “Data Pipeline”
• The uptake of process driven as distinct to document driven supply chains as required to gain benefit from blockchain and IoT technologies, and in support of “Event Driven Architectures” based services
• Deployment of UN/CEFACT’s Reference Data Model approach
To deliver UN/CEFACT must now focus on processes and choreography moving beyond primarily focussing only on message definition. |
Project Scope
Text Area | ||||
---|---|---|---|---|
| ||||
The project will examine all current UN/CEFACT deliverables covering BRS; RSM; ISCRM; CCL: SCRDM & MMT-RDM; MA & schema.
Based on the existing UMM (2003) and CCTS (2003) both designed to ensure that UN/CEFACT works to the delivery of the required canonical model, and in considering newer technologies, an analysis will be conducted to determine the extent to which modernization may be required of the base UN/CEFACT instruments and methods.
Preliminary assessment and experience dating back to 2002 indicates that to original developers of the UN/CEFACT instruments UMM & CCTS held great insight into the directions of future technologies including blockchain and sensor technology.
The project will assess any identifiable gap in existing instruments, tools and methods, make recommendations as to how to address, and then to develop guidelines to ensure that the opportunity to use to greater purpose in particular UMM and related artifacts is addressing the global move to Event Driven Architectures applied to software based business solutions. This project may result in subsequent projects where technical specifications may need to be updated to the latest technologies. |
Project Deliverables
Text Area | ||||
---|---|---|---|---|
| ||||
The project deliverables are:
• Gap analysis and recommendations with respect to any ‘modernization’ required of existing instruments, methods or deliverables.
• Report on the current and proposed use of tools, both commercial and bespoke as deployed in the work of developing UN/CEFACT recommendations and standards
• Development of Guidelines for extended/deeper use of UMM, CCTS and resultant BRS, RSM, ISCRM, SCRDM, MMT-RDM, CCL, schema
• Executive guide material suited to communication of the UN/CEFACT capability in standards development
|
|
Excerpt | |||||
---|---|---|---|---|---|
Project purposeThe project’s purpose is to address the now globally recognised importance of the role of canonical process and data models in facilitating trade. Given UN/CEFACT’s current global recognition as a proven and effective standards developer, the development of such a canonical mode is considered to be UN/CEFACT’s number one opportunity. The project will draw on UN/CEFACT’s sound foundations and current progress to date in the development of such a canonical model and proceed to develop guidelines to assist all working groups engaged in the development of UN/CEFACT standards and recommendations to contribute effectively to the delivery of the required canonical model.
The opportunity & the driving forces UN/CEFACT is poised to significantly contribute to:
To deliver UN/CEFACT must now focus on processes and choreography moving beyond primarily focussing only on message definition. Project scopeThe project will examine all current UN/CEFACT deliverables covering BRS; RSM; ISCRM; CCL: SCRDM & MMT-RDM; MA & schema. Based on the existing UMM (2003) and CCTS (2003) both designed to ensure that UN/CEFACT works to the delivery of the required canonical model, and in considering newer technologies, an analysis will be conducted to determine the extent to which modernization may be required of the base UN/CEFACT instruments and methods. Preliminary assessment and experience dating back to 2002 indicates that to original developers of the UN/CEFACT instruments UMM & CCTS held great insight into the directions of future technologies including blockchain and sensor technology. The project will assess any identifiable gap in existing instruments, tools and methods, make recommendations as to how to address, and then to develop guidelines to ensure that the opportunity to use to greater purpose in particular UMM and related artifacts is addressing the global move to Event Driven Architectures applied to software based business solutions. This project may result in subsequent projects where technical specifications may need to be updated to the latest technologies. |
Project Deliverables
The project deliverables are:
- Gap analysis and recommendations with respect to any ‘modernization’ required of existing instruments, methods or deliverables.
- Report on the current and proposed use of tools, both commercial and bespoke as deployed in the work of developing UN/CEFACT recommendations and standards
- Development of Guidelines for extended/deeper use of UMM, CCTS and resultant BRS, RSM, ISCRM, SCRDM, MMT-RDM, CCL, schema
- Executive guide material suited to communication of the UN/CEFACT capability in standards development
Exit Criteria
The exit criteria will be:
- Gap analysis and recommendations with respect to any ‘modernization’ required of existing instruments, methods or deliverables.
- Analysis and recommendations presented to the Bureau for Project Exit
- Report on the current and proposed use of tools, both commercial and bespoke as deployed in the work of developing UN/CEFACT recommendations and standards
- Report presented to the Bureau for Project Exit
- Development of Guidelines for extended/deeper use of UMM, CCTS and resultant BRS, RSM, ISCRM, SCRDM, MMT-RDM, CCL, schema
- Guideline presented to the Bureau and intended to be circulated to all Domains and eventually published on the website for future usage guidance.
- Executive guide material suited to communication of the UN/CEFACT capability in standards development
- Guide presented to the Bureau and intended to be presented to the Plenary for information and published on the
Exit Criteria
default | <click here to edit> |
---|---|
id | exit_criteria |
- website.
Project Team Membership and Required Functional Expertise
The
project
team
is
open
to
experts
with
broad
knowledge
and
experience
in
the
area
of
supply
chain
and
related
activities
as
well
as
in
modelling
techniques.
In
addition,
Heads
of
Delegations
may
invite
technical
experts
from
their
constituency
to
participate
in
the
work.
Experts
are
expected
to
contribute
to
the
work
based
solely
on
their
expertise
and
to
comply
with
the
UN/CEFACT
Code
of
Conduct
and
Ethics.
Head of Delegation Support
HoD
support
not
required
for
internal
/
communication
deliverables.
Geographical Focus
The
geographical
focus
is
global.
Initial Contributions
- UN/CEFACT
- Modelling
- Methodology
- (CEFACT/TMG/N093)
- UN/CEFACT
- ebXML
- Core
- Components
- Technical
- Specification
- Version
- 2.01
- UN/EDIFACT
- Data
- element
- directory
- D.16A
- BRS and RSM Templates
Resource Requirements
No additional secretariat resources will
Resource Requirements
default | <click here to edit> |
---|---|
id | resource_requirements |
required.
Project Leadership
Text Area | ||||
---|---|---|---|---|
| ||||
Proposed Project Leader. Tat Tsen Jonathon Koh |
Proposed Project Leader: Jonathan Tat Tsen KOH
Restrict Content | ||||
---|---|---|---|---|
| ||||
Milestones |
Milestones
|
|
Text Field | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Text Field | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
Date Picker | ||||
---|---|---|---|---|
| ||||
|
Select2 | ||||||
---|---|---|---|---|---|---|
| ||||||
|
default | NO DATE SELECTED |
---|---|
id | expdate_odp777 |
Project Proposal Files
Attachments | ||
---|---|---|
|